A Plus Design Group provided design and engineering for 7 distribution centers and offices for FedEx. The projects are located throughout the country in Montana, Colorado, Arkansas, Texas, West Virginia, and Louisiana. These new freight facilities are efficiently arranged to allow up to 80 trucks to be loaded and unloaded simultaneously. This design project also includes the design of administrative support offices which include corporate work space, conference and meeting rooms, dispatch centers, and worker break areas. The buildings are mostly metal exterior with some tilt up concrete and stucco details.
September 17, 2017
Freight/Industrial